- Home
- Features
- Manufacturing & MRP
- Product lifecycle (PLM) and revisions
Manufacturing & MRP · Product lifecycle (PLM)
Product lifecycle (PLM) and revisions
Lifecycle states of manufactured items, dated bill of materials revisions, change requests and orders (ECR, ECO), documents, traceability and costs.
Control the evolution of your manufactured items: lifecycle states with controlled transitions, lettered and dated bill of materials revisions (only one active at a given date), change requests and change orders approved by several roles, multi-level where-used, versioned technical documents in the DMS, CE, REACH and RoHS compliance, revision used by each work order and standard cost per revision, the « Lifecycle » entry of the Production hub falls under the Production access right and plan module.
4 features described on this page
What this screen does
Lifecycle states
Design, prototype, approved, in production, end of life, obsolete: only the planned transitions are offered, approval, release to production and obsolescence are reserved for lifecycle approvers, release to production requires an active bill of materials revision, obsolescence is refused as long as a work order is open, the catalogue status follows (« In development », « Active », « Inactive ») and each transition is logged with its reason.
Bill of materials revisions
Revisions carry a letter (A, B, C… without I, O, Q, S, X or Z, then AA, AB, following ASME Y14.35 practice), a new revision is created as a draft, is activated at an effective date that closes the previous one the day before, and an activation that would overlap a planned revision is refused, two revisions can be compared line by line (additions, removals, quantities, scrap, operations) with the standard cost difference.
Good to know
- Work orders, material consumption, stock reservations and requirements planning use the revision active at the release date.
- An activation at a past date freezes, on the work orders already released since that date, the revision with which they were manufactured.
Documents and compliance
Drawings, technical data sheets, CAD files, instructions, EU declarations of conformity: each upload creates the next revision in the private document storage and keeps the item's DMS record and its version history up to date, approving a revision supersedes the previous one, the compliance record holds the CE marking (legislation, standards, notified body, EU declaration, documentation kept 10 years after placing on the market), REACH candidate list substances above 0.1% (customer information, SCIP notification) and RoHS substances against the maximum concentrations (0.1%, cadmium 0.01%).
Traceability, where-used and costs
Each work order records the revision selected at its release (older work orders show the inferred revision and can be assigned it), where-used goes up through all bills of materials, level by level, with cumulative quantities, the standard cost of a revision adds up materials (sub-assemblies at their own standard cost), labour, machine and work centre overheads, and can be carried over to the item record.
Plans
Included in
- Most chosen
Growth
€40per user per month
For growing SMEs.
- Up to 25 users
- 5 GB of storage included
- Everything in Starter
Enterprise
€100per user per month
For groups and multi-company mid-sized businesses.
- Unlimited users
- 10 GB of storage included, then €20 per extra GB
- 100 % of the modules
Manufacturing & MRP
Frequently asked questions
- Where do I find « Product lifecycle (PLM) » in IRPEA?
- In the ERP, the « Operations » menu, « Lifecycle » entry, 4 features are described on this page, as the in-app help centre presents them.
- Which plan do I need to access it?
- The screen is included in the Growth (€40 per user per month) and Enterprise (€100 per user per month) plans, and the free 30-day demo opens every feature.
The module
Other features of the module
- The whole module : Manufacturing & MRP
- Multi-level bills of materials (BOM)Multi-level bills of materials with routing, alternative components, exploded cost, versions, quality and compliance, to manufacture without retyping.
- Net requirements planning (MRP)Requirements planning: automatic net requirements calculation and generation of purchase and work orders, with a safety stock for each item.
- Project management and Gantt planningProject planning, progress tracking, resources, budget and time-based billing, Gantt chart with task dependencies and critical path.
Try this screen on your own data
Free 30-day demo, no credit card, every feature open.