- Multi-level bills of materials (BOM)
Manufacturing & MRP · Bills of materials (BOM)
Multi-level bills of materials (BOM)
Multi-level bills of materials with routing, alternative components, exploded cost, versions, quality and compliance, to manufacture without retyping.
Advanced Bill of Materials: multi-level composition, routing, alternate components, exploded cost, versions/ECO, compliance and quality.
4 features described on this page
What this screen does
Management of the BOMs (9 tabs)
Comprehensive form across 9 tabs: Definition, Components, Routing/Operations, Alternatives, Costs & Ops, Exploded cost, Technical, Quality, Versions/ECO. Each BOM is versioned with a lifecycle (Draft → Active → Obsolete).
Fields
- Components
- Required items with quantity/unit, lines added dynamically.
- Supply lead time
- Lead time in days for planning MRP orders.
- Yield rate
- % of compliant output, e.g. 98% = allow for 2% losses.
- Batches min/max
- Minimum and maximum batch size for manufacturing.
- Phantom BOM
- Phantom bill of materials (phantom BOM) — the MRP explodes the components directly without creating an intermediate work order.
- Validity
- Start and end validity dates of the BOM.
Good to know
- The multi-level Tree view shows the entire hierarchy of nested BOMs
- The exploded cost breaks down materials, labour, and scrap for each component
- The "Where used" search identifies which BOMs a component appears in
- Detection of INDIRECT cycles on save: if a component (directly or via a child BOM) references the parent finished product, the save is refused — no more undetectable A → B → A loops.
- Deletion blocked if an MO is active: impossible to delete a bill of materials used by MOs with status planned/in_progress/on_hold (the list of MOs concerned is displayed).
Operation routing
Define the manufacturing operation sequence: each operation has a sequence number, a work centre, times (setup, run, wait, move), required tooling, operator skill level and a subcontracting flag.
Good to know
- The summary at the bottom of the routing shows total time per category (setup, execution, wait)
- Subcontracted operations let you record the subcontractor's name
- Required tooling helps plan machine availability
Alternative components
For each component, define substitutes in case of a stock shortage, each alternative has an original component, a substitute component, a conversion factor, a priority and notes.
Good to know
- The conversion factor handles unit differences (e.g., 1 roll = 50 sheets)
- The priority determines the order in which alternatives are used in case of a stock-out
Quality & Compliance
Mandatory outbound quality control, quality protocol reference, complexity level, environmental notes (REACH/RoHS), compliance certifications, approval by a manager with date.
Good to know
- Certifications (ISO, CE, RoHS, REACH) are stored as tags and can be searched
- Approval by a manager is required before the status changes to Active
- The environmental notes document restricted substances in accordance with REACH
Plans
Included in
- Most chosen
Growth
€40per user per month
For growing SMEs.
- Up to 25 users
- 5 GB of storage included
- Everything in Starter
Enterprise
€100per user per month
For groups and multi-company mid-sized businesses.
- Unlimited users
- 10 GB of storage included, then €20 per extra GB
- 100 % of the modules
Manufacturing & MRP
Frequently asked questions
- Where do I find « Bills of materials (BOM) » in IRPEA?
- In the ERP, the « Operations » menu, « Bills of Materials » entry, 4 features are described on this page, as the in-app help centre presents them.
- Which plan do I need to access it?
- The screen is included in the Growth (€40 per user per month) and Enterprise (€100 per user per month) plans, and the free 30-day demo opens every feature.
The module
Other features of the module
- The whole module : Manufacturing & MRP
- Project management and Gantt planningProject planning, progress tracking, resources, budget and time-based billing, Gantt chart with task dependencies and critical path.
- Product lifecycle (PLM) and revisionsLifecycle states of manufactured items, dated bill of materials revisions, change requests and orders (ECR, ECO), documents, traceability and costs.
- Net requirements planning (MRP)Requirements planning: automatic net requirements calculation and generation of purchase and work orders, with a safety stock for each item.