# What’s new: HR, payroll and manufacturing

> 8 updates shipped in IRPEA ERP for hr, payroll and manufacturing: recruitment and internal training, product configurator and lifecycle, construction and job.

Adresse : https://www.irpea.com/en/whats-new/hr-payroll-manufacturing
Mis à jour : 2026-11-24
Site : IRPEA ERP (https://www.irpea.com)

Shipped and running in the ERP, each update links to the module page that describes it.

## Recruitment and internal training

The Talents hub covers hiring from the approved request to the employee’s arrival, then internal training and career path interviews.

- Public careers page with online applications, legal check of job ads and JobPosting feeds, GDPR retention of 24 months at most
- Multi-assessor scorecards, interview invitations with calendar, e-signed job offers, DPAE prepared
- E-learning with graded quizzes and certificates, training plan and funding, expiring certifications, career path interviews under the 2025 law

## Product configurator and lifecycle

Manufacturers price made-to-order products in a few clicks and control every change to their bills of materials, from design to obsolescence.

- Compatible options, price, margin and lead time calculated live, stable item reference, derived bill of materials and routing, quote then work order
- Dated bill of materials revisions, change orders approved by several roles, handling of existing stock
- Versioned technical documents, CE, REACH and RoHS compliance, revision used by each work order and standard cost per revision

## Construction and job sites

Building and civil engineering firms price, bill on progress and track the profitability of every job site, subcontracting included.

- Work item library with cost breakdowns, measured quotes, bills of quantities and price schedules, CSV or Excel import and export
- Progress claims with INSEE BT/TP price adjustment, retention or guarantee, advance repayment, penalties and direct payment; final account
- Subcontractor compliance every six months, site diary, photos, time entry and snags from the phone, percentage-of-completion accounting

## Training organisations

Training providers run their catalogue, sessions, trainees, funding and Qualiopi in the ERP, right up to the annual educational and financial report.

- Training agreements and individual contracts compliant with the Labour Code, invitations, waiting list
- Half-day attendance signed online with a QR code or on site, certificate of completion on the official template
- Invoices by funder (OPCO, CPF, France Travail), Qualiopi dashboard with evidence in the DMS, BPF form 10443*17

## Advanced production planning

Multi-level requirements planning, finite-capacity scheduling and shop-floor tracking in the Production module.

- Planned work orders and purchase requisitions released in bulk, expedite / postpone / cancel messages
- Forward or backward Gantt on work-centre calendars, what-if simulation and recalculated promise dates
- Clock-in per operation, lot traceability, ISO 22400 OEE and actual versus standard costs

## Agriculture and grain trading

Farms, cooperatives and grain traders keep their fields, crop log, registers and collection in the ERP, right up to the CAP application and margins per crop.

- Field map imported from Telepac or the LPIS, map, crop plan and rotation
- Spray register checked on entry, fertilisation and nitrogen ceiling, TFI
- Deliveries with quality deductions, self-billing, contracts, diffuse pollution levy, CAP

## DSN P26V01 and DTI+ in official formats

The monthly DSN, its event reports and customs DTI+ returns are generated in official formats and checked locally.

- DSN under the P26V01 technical specifications, sick leave, return to work and end of contract reports
- DTI+ (EMEBI and VAT summary statement) checked against the customs schema
- Files archived in the document store; automatic filing to come, DSN filed through the firm’s connection when active

## Withholding tax rates in sync

The withholding tax rate gateway syncs on its own, every n days.

- HTTP gateway you configure, from 1 to 90 days (7 by default)
- On failure: a new try the next day, a report to administrators
- Rates received are never applied to employee records without you
