# Product lifecycle (PLM) and revisions

> Lifecycle states of manufactured items, dated bill of materials revisions, change requests and orders (ECR, ECO), documents, traceability and costs.

Adresse : https://www.irpea.com/en/features/manufacturing-mrp/product-lifecycle-plm
Mis à jour : 2026-11-24
Site : IRPEA ERP (https://www.irpea.com)

Lifecycle states of manufactured items, dated bill of materials revisions, change requests and orders (ECR, ECO), documents, traceability and costs.

Control the evolution of your manufactured items: lifecycle states with controlled transitions, lettered and dated bill of materials revisions (only one active at a given date), change requests and change orders approved by several roles, multi-level where-used, versioned technical documents in the DMS, CE, REACH and RoHS compliance, revision used by each work order and standard cost per revision; the « Lifecycle » entry of the Production hub falls under the Production access right and plan module.

Module: [Manufacturing & MRP](https://www.irpea.com/en/features/manufacturing-mrp)

## Lifecycle states

Design, prototype, approved, in production, end of life, obsolete: only the planned transitions are offered, approval, release to production and obsolescence are reserved for lifecycle approvers; release to production requires an active bill of materials revision, obsolescence is refused as long as a work order is open; the catalogue status follows (« In development », « Active », « Inactive ») and each transition is logged with its reason.

## Bill of materials revisions

Revisions carry a letter (A, B, C… without I, O, Q, S, X or Z, then AA, AB, following ASME Y14.35 practice); a new revision is created as a draft, is activated at an effective date that closes the previous one the day before, and an activation that would overlap a planned revision is refused; two revisions can be compared line by line (additions, removals, quantities, scrap, operations) with the standard cost difference.

### Good to know

- Work orders, material consumption, stock reservations and requirements planning use the revision active at the release date.
- An activation at a past date freezes, on the work orders already released since that date, the revision with which they were manufactured.

## Documents and compliance

Drawings, technical data sheets, CAD files, instructions, EU declarations of conformity: each upload creates the next revision in the private document storage and keeps the item's DMS record and its version history up to date; approving a revision supersedes the previous one; the compliance record holds the CE marking (legislation, standards, notified body, EU declaration, documentation kept 10 years after placing on the market), REACH candidate list substances above 0.1% (customer information, SCIP notification) and RoHS substances against the maximum concentrations (0.1%, cadmium 0.01%).

## Traceability, where-used and costs

Each work order records the revision selected at its release (older work orders show the inferred revision and can be assigned it); where-used goes up through all bills of materials, level by level, with cumulative quantities; the standard cost of a revision adds up materials (sub-assemblies at their own standard cost), labour, machine and work centre overheads, and can be carried over to the item record.

## Frequently asked questions

### Where do I find « Product lifecycle (PLM) » in IRPEA?

In the ERP, the « Operations » menu, « Lifecycle » entry, 4 features are described on this page, as the in-app help centre presents them.

### Which plan do I need to access it?

The screen is included in the Growth (€40 per user per month) and Enterprise (€100 per user per month) plans, and the free 30-day demo opens every feature.