# Net requirements planning (MRP)

> Requirements planning: automatic net requirements calculation and generation of purchase and work orders, with a safety stock for each item.

Adresse : https://www.irpea.com/en/features/manufacturing-mrp/mrp-planning
Mis à jour : 2026-08-17
Site : IRPEA ERP (https://www.irpea.com)

Requirements planning: automatic net requirements calculation and generation of purchase and work orders, with a safety stock for each item.

Material Requirements Planning: automatic calculation of net requirements and generation of purchase and work orders.

Module: [Manufacturing & MRP](https://www.irpea.com/en/features/manufacturing-mrp)

## Requirements planning

MRP analyses confirmed orders and forecasts, explodes BOMs and computes net requirements: gross requirement - available stock - work in progress = net requirement; it automatically generates the required work orders and purchase orders.

### Steps

1. Run the MRP calculation (daily or weekly)
2. The system explodes the BOMs for each requirement
3. Net requirement = Gross requirement - Available stock - In production - On order
4. For each net requirement: proposed work order (in-house manufacturing) or purchase order (external purchase)
5. Approve the proposals — the work orders and purchase orders are created

### Good to know

- Enhanced suggestions: current stock, reorder point, quantity already ON ORDER and average consumption displayed per line.
- Purchase order generation: creates REAL documents of type purchase_order (grouped by supplier, Draft status) directly visible in the Purchases module.
- Forecasts: « Import from orders » retrieves the real demand from open sales orders (remaining to be delivered) as a forecast adjustment.
- Supplier lead times: average lead time derived from the supplier's products; payment terms and reliability taken from the supplier record.
- Persistence: decisions (approved/rejected/ordered) per suggestion, production plans and calculation histories saved in the database; idempotent recalculation (stable key per product).

## Settings: safety stock per item — actually saved

The “Settings” tab displayed “Settings saved” without writing anything: thresholds lived in a local state and were lost as soon as the tab changed. The four values are now persisted on the item and genuinely drive the calculation.

### Fields

- **Where these values are stored** : Directly on the item (safety stock, maximum stock, reorder point, supplier lead time) — exactly the fields read by the net requirements calculation, reorder suggestions and stock-out alerts. No separate settings table, so no risk of divergence with the engine.
- **Displayed values = applied values** : An item without settings shows what the engine really applies (0 for thresholds, 7 days for lead time), not invented “plausible” values. An empty reorder point takes the safety stock, as the calculation does.
- **Honest saving** : Only the items actually modified are written; the count announced is the number of items actually saved; in the event of a failure (database unavailable, insufficient permissions on the Inventory module), a detailed error message is displayed and the failed entry stays on screen so it can be retried.
- **Consistency checks** : Negative or non-numeric value refused, maximum stock lower than the safety stock refused, reorder point above the ceiling refused; a maximum stock of 0 means « not defined » and is not compared.

### Limits

- These settings are saved on the item record: they are therefore shared with the Inventory module, and changing a threshold here changes it everywhere.

## Frequently asked questions

### Where do I find « Planning » in IRPEA?

In the ERP, the « Operations » menu, « Planning » entry, 2 features are described on this page, as the in-app help centre presents them.

### Which plan do I need to access it?

The screen is included in the Growth (€40 per user per month) and Enterprise (€100 per user per month) plans, and the free 30-day demo opens every feature.