# Multi-level bills of materials (BOM)

> Multi-level bills of materials with routing, alternative components, exploded cost, versions, quality and compliance, to manufacture without retyping.

Adresse : https://www.irpea.com/en/features/manufacturing-mrp/bills-of-materials
Mis à jour : 2026-11-24
Site : IRPEA ERP (https://www.irpea.com)

Multi-level bills of materials with routing, alternative components, exploded cost, versions, quality and compliance, to manufacture without retyping.

Advanced Bill of Materials: multi-level composition, routing, alternate components, exploded cost, versions/ECO, compliance and quality.

Module: [Manufacturing & MRP](https://www.irpea.com/en/features/manufacturing-mrp)

## Management of the BOMs (9 tabs)

Comprehensive form across 9 tabs: Definition, Components, Routing/Operations, Alternatives, Costs & Ops, Exploded cost, Technical, Quality, Versions/ECO. Each BOM is versioned with a lifecycle (Draft → Active → Obsolete).

### Fields

- **Components** : Required items with quantity/unit, lines added dynamically.
- **Supply lead time** : Lead time in days for planning MRP orders.
- **Yield rate** : % of compliant output, e.g. 98% = allow for 2% losses.
- **Batches min/max** : Minimum and maximum batch size for manufacturing.
- **Phantom BOM** : Phantom bill of materials (phantom BOM) — the MRP explodes the components directly without creating an intermediate work order.
- **Validity** : Start and end validity dates of the BOM.

### Good to know

- The multi-level Tree view shows the entire hierarchy of nested BOMs
- The exploded cost breaks down materials, labour, and scrap for each component
- The "Where used" search identifies which BOMs a component appears in
- Detection of INDIRECT cycles on save: if a component (directly or via a child BOM) references the parent finished product, the save is refused — no more undetectable A → B → A loops.
- Deletion blocked if an MO is active: impossible to delete a bill of materials used by MOs with status planned/in_progress/on_hold (the list of MOs concerned is displayed).

## Operation routing

Define the manufacturing operation sequence: each operation has a sequence number, a work centre, times (setup, run, wait, move), required tooling, operator skill level and a subcontracting flag.

### Good to know

- The summary at the bottom of the routing shows total time per category (setup, execution, wait)
- Subcontracted operations let you record the subcontractor's name
- Required tooling helps plan machine availability

## Alternative components

For each component, define substitutes in case of a stock shortage; each alternative has an original component, a substitute component, a conversion factor, a priority and notes.

### Good to know

- The conversion factor handles unit differences (e.g., 1 roll = 50 sheets)
- The priority determines the order in which alternatives are used in case of a stock-out

## Quality & Compliance

Mandatory outbound quality control, quality protocol reference, complexity level, environmental notes (REACH/RoHS), compliance certifications, approval by a manager with date.

### Good to know

- Certifications (ISO, CE, RoHS, REACH) are stored as tags and can be searched
- Approval by a manager is required before the status changes to Active
- The environmental notes document restricted substances in accordance with REACH

## Frequently asked questions

### Where do I find « Bills of materials (BOM) » in IRPEA?

In the ERP, the « Operations » menu, « Bills of Materials » entry, 4 features are described on this page, as the in-app help centre presents them.

### Which plan do I need to access it?

The screen is included in the Growth (€40 per user per month) and Enterprise (€100 per user per month) plans, and the free 30-day demo opens every feature.
